May 2013
In May 2013, the two units at Cernavoda produced 692.207 MWh. Unit 1 registered an average capacity factor of 101,08% and Unit 2 – 31,83%, Unit 2 being in planned shutdown. The station performance chart is attached.
In May 2013, the two units at Cernavoda produced 692.207 MWh. Unit 1 registered an average capacity factor of 101,08% and Unit 2 – 31,83%, Unit 2 being in planned shutdown. The station performance chart is attached.